Chapter 25 - The Contractor's Warning

The roof contractor called Elise before sunrise.
During the removal of the old roofing, the crew had found structural damage around a support beam. The issue was more extensive than the initial inspection had suggested. Work had stopped until an engineer could assess the area.
Elise arrived at the site with Walter.
The beam was concealed behind a section of ceiling. Once the plaster was removed, the damage became obvious. Water had entered for years, weakening part of the timber and damaging the connection to the adjoining wall.
Walter studied the engineer's preliminary notes.
“We can repair it,” he said. “But we need a revised detail and a new inspection.”
Nina calculated the likely cost.
The contingency fund was nearly exhausted.
Elise asked the contractor to secure the area and submit a written change order. She also contacted the city immediately. She would not authorize additional work based on a hurried phone estimate.
That afternoon, the project team met with the neighborhood board.
A resident asked whether the center would still open before winter.
“I can't promise that today,” Elise said. “We won't put a date ahead of safety.”
The room was disappointed. Elise understood. People had waited years for the building to reopen.
She explained the repair, the review process, and the revised schedule. Then she invited the engineer to answer technical questions.
After the meeting, Nina asked whether Elise was worried about the project's finances.
“Of course.”
“Do you think we can finish?”
“I think we can make a decision when we have the actual numbers.”
They spent the evening reviewing the budget. Northline would need to reduce some nonessential finishes and seek a modest additional contribution from the city.
May you like
The project would take longer.
It would still be done properly.